loading
Africa
Europe
Oceania
Asia
North America
South America
Antarctica

東區海底隧道旁地盤第7期公共房屋發展 Eastern Harbour Crossing Site Phase 7 Public Housing Development

  ( "觀塘區 Kwun Tong District", "香港 Hong Kong", Hong Kong )
construction  time Mon, Aug 4 17:43
22.3026475983571 114.236510629044

東區海底隧道旁地盤第7期公共房屋發展 Eastern Harbour Crossing Site Phase 7 Public Housing Development coordinates are 22°18'10" N and 114°14'11" E in DMS (Degrees Minutes and Seconds) or 22.3026 latitude and 114.236 longitude (in decimal degrees). 東區海底隧道旁地盤第7期公共房屋發展 Eastern Harbour Crossing Site Phase 7 Public Housing Development has an elevation of ~? meters. Current local time is 17:43; the sun rises at 05:56 and sun sets at 19:01 local time (Asia/Hong_Kong UTC/GMT+8).
loading
low clouds
middle clouds
high clouds
convective clouds
Precipitation
Showers
Temperature
0 C
Wind speed
Wind gusts